loading

YMS PAINT Over 20 years experience in the production of customized industrial paint coatings

VIDEO

YMS Paint, over 20 years of experience in the production of customized anticorrosive coatings

VIDEO

Explore a detailed polyurethane waterproof paint construction case. Learn best practices for surface prep, PU coating application methods, curing, and achieving a durable, seamless waterproof membrane for roofs, terraces, or basements.

Step 1:
Plugging and Leveling
Remove bumps on walls and floors, sweep the ground,
and keep it dry, sand-free, and dust-free.

Step 2:
Substrate Treatment
Plug and level the leaks at the roots of floors,
wall joints, and pipes.

Step 3:
First Coat Application
For the first vertical coat, apply from top to
bottom and from inside to outside.

Wait for 3 to 5 hours to allow it to dry.

Step 4:
Second Coat Application
After curing, start applying the
second coat horizontally.

Conduct a water storage test after 48 hours.

Step 1:
Substrate Treatment
Clean the surface and sand the rusted areas.
Rinse the Surface

Step2:
Apply the First Coat of Reflective
Heat Resistant Paint

Wait for 2 to 4 hours for complete drying.

Step3:
Apply the Second Coat of Reflective
Heat Resistant Paint

Significant Heat Insulation Effect
no data
Our fundamental product range, which encompasses rust-resistant industrial paints, paints with acid and alkali resistance, high-temperature-resistant paints, building and floor paints, and so on, aids in safeguarding the substrates while prolonging their lifespan for several years to come.
Contact with us
Tel: 0086-17312895118
Fax: +86-519-85506198

Address:
No.2 Building 12, Hengsheng Technology Park II, No.8, Beitanghe Road, anning District, Changzhou, Jiangsu, China
Copyright © 2025 YMS Paints - www.jianbangcoatings.com | Sitemap
Customer service
detect