loading

YMS paint manufacturers started in 2001, specialized in the production of customized  coatings. | YMS Paint the professional Industrial Paint Suppliers, Anti Corrosive Paint Manufacturer.

这里可以自定义设置
Epoxy Commercial Floor Paint Final
B站不支持收货地址
B站不支持库存规格
Color:
Choose from the color card
Usage
(35-75)Glossy
Solid Volume:
50±2 %
Coverage:
5 to 8 sq.meters per litre
Film Thickness:
DFT: 40-60µm (WFT: 80-120µm)
Theoretical Spreading Rate:
12.5-8.3m²/L
Full Cure:
7d
Flash Point:
25 ℃
Shelf Life:
12 months in sealed container
Ready For Foot Traffic:
After 24 hours
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容
这里可以自定义设置

Epoxy floor coat is two parts amide cured epoxy that designed to give a chemical resistant, durable and hard wearing surface on a concrete floor. Also, it combines incredible hardness and bonding power to provide a heavy duty and to be used as topcoat. The main advantages of epoxy floor coat are immensely tough, fast curing, virtually odour free, chemical resistant, easy to clean and non-flammable.

 

Typical Uses:

This product is designed for a wide range of floors with various levels of mechanical and chemical exposure. It also used to protect material on substrate like concrete floors in workshops, factories, warehouse, garages etc. The idea for internal use only. It will cause yellowing and deterioration of the paint film over time when exposure to direct sunlight.

这里可以自定义设置
这里可以自定义设置

Application Guide

● Mixing:

Stir the part A evenly by power mixer then add hardener until fully mixed. Generally, if the temperature below 10 ℃, it needs 30 min induction time; if the temperature over 10, it needs 15 min induction time.

● Mixing Ratio:

Part A: Part B= 20: 5 (by weight).

● Thinner:

X-7 epoxy paint thinner.

● Airless Spray:

Nozzle tip: 0.021~0.025 inch.

Spray pressure: 15~18 MPa.

Thinner ratio: 0~10% (by weight of paint).

● Brush, Roller::

Recommended for small areas only. Must achieve required thickness.

DRYING SCHEDULE 

Substrate temperature

10 °C

20 °C

30 °C

To touch (1mm)

4h

2h

1h

To handle (1mm)

24h

12h

6h

Min. recoating time

16h

8h

4h

Max. recoating time

10h

7h

5h

Pot life

4h

1h

1h

* Make sure no chalking and other contaminations before recoating.

* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition.

这里可以自定义设置

SURFACE TREATMENT

 

All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.

Steel: Sanding to Sa2.5 (ISO8501-1:2007). It is acceptable to polish by power tools to meet at least St2.0(ISO8501-1:2007).

Steel coated with workshop primer: make sure workshop primer surface is clean, dry and undamaged.

Coated surface: applied on clean, dry and undamaged primer only.

APPLICATION 

Application conditions: Substrate temperature shall be at 3 ℃ higher than dew point, relative humidity less than 85%. Measurement of temperature and humidity should be close to substrate.

这里可以自定义设置

CLASSICAL COATING SYSTEM

Please inquiry JIANBANG Paint for specific coating solutions.

Epoxy Sealing Primer: 30 µm (dry film thickness)

Epoxy Putty: 1*1mm (dry film thickness)

Epoxy Floor Paint: 1~2mm(dry film thickness)

这里可以自定义设置

SAFETY AND HEALTH

Please refer to MSDS before using this product. If you do not fully understand the restrictions, or cannot follow MSDS directions strictly, do not use this product. This volatile product is flammable. Keep this product away from flame or fire. Smoking is strictly prohibited in working area. Keep working area ventilated during application to make sure solvent vapor content is low in the air. PPE is necessary to avoid this product contacting with eyes or skin. More detailed safety tips are based on practical situation.

Please handle used paint barrel correctly to avoid any pollution.

 

Storage:

Store this product in shady, dry, and ventilated warehouse away from fire and heat. The shelf life is 12 months at room temperature.

 

Disclaimer:

All technical data given in this document is based on our knowledge achieved in lab and practice, it is not completely correct. Although we try to keep the validity of our advice, however we cannot predict the practical conditions that will affect paint quality. Herein, we cannot be responsible for the consequences of variations in such conditions, or for unforeseen conditions. We reserve the right to modify this document without informing in advance. 

Packaging

Packing size

Packing weight

Part A

20L

20 KG

Part B

6L

5 KG

Certificate

  • CE Certificate
    CE Certificate
  • Environmental Management Syatem ISO14001 New
    Environmental Management Syatem ISO14001 New
  • Occupational Health And Safety Management System OHSAS 18001 New
    Occupational Health And Safety Management System OHSAS 18001 New
  • Quality Management System ISO 9001 New
    Quality Management System ISO 9001 New
  • ROHS Report
    ROHS Report
  • SASO1
    SASO1
  • sgs1
    sgs1
  • sgs2
    sgs2
  • SRC
    SRC

PRODUCT MESSAGE

社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
We will get back to you asap