loading

YMS paint manufacturers started in 2001, specialized in the production of customized  coatings. | YMS Paint the professional Industrial Paint Suppliers, Anti Corrosive Paint Manufacturer.

PRODUCT

Oriented by technology, we serve customers worldwide not only our high quality products, but also technical consultation and engineering scenarios.

Home  > PRODUCTS  > Epoxy Floor Paint  > 

Epoxy resin paint for wood and floor

这里可以自定义设置
Epoxy resin paint for wood and floor
B站不支持收货地址
B站不支持库存规格
Color:
Transparent
Usage
Glossy
Density:
1.32
Solid Volume:
100%
Theoretical Spreading Rate:
0.74m²/Kg (1mm dry film thickness)
Film Thickness:
1mm dry film thickness (about 1.02mm wet film thickness)
Full Cure:
(23±2℃) 7d
Flash Point:
27℃
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容
这里可以自定义设置

PRODUCT DESCRIPTION

This two component product is based on epoxy resin and high quality curing agent. The main advantages of paint are smooth surface, beautiful and mirror effect. This paint combines incredible hardness and bonding power to provide a heavy duty and to be used as topcoat. Furthermore, it has excellent resistance to acid, alkali, oil and chemical  corrosion.

 

Typical Uses:

This product is used for high requirements for clean, beautiful, dust-free, sterile electronics and microelectronics industry. Moreover, it can be used for other industries that require abrasion resistance, impact resistance and chemical corrosion prevention.

这里可以自定义设置
这里可以自定义设置

Application Guide

● Mixing:

Use the power mixer to mix the main paint evenly, and then as you stir it, you add the hardener until you get to mix well. Generally, if the temperature below 10 ℃, it needs 20 min induction time; if the temperature over 10℃, it needs 15 min induction time.

● Mixing Ratio:

Part A: Part B= 20: 5 (by weight).

● Scrape Coating:

Uniform smooth, must be required dry film thickness.

DRYING SCHEDULE 

Substrate temperature

10 °C

20 °C

30 °C

To touch (1mm)

4h

2h

1h

To handle (1mm)

24h

12h

6h

Min. recoating time

16h

8h

4h

Max. recoating time

10h

7h

5h

Pot life

1.5h

1h

0.5h

* Make sure no chalking and other contaminations before recoating.

* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition.

这里可以自定义设置

SURFACE TREATMENT

 

All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.

 

Steel: Sanding to Sa2.5 (ISO8501-1:2007). It is acceptable to polish by power tools to meet at least St2.0(ISO8501-1:2007).

Concrete surface treatment:

a. First of all, it is necessary to confirm whether reliable damp-proof facilities are installed below the concrete base. The new concrete or cement base should be cured for at least 28 days, and its moisture content should not exceed 5%. The moisture content of the base should be evaluated by empirical method.

b. The base surface should be clean, solid and pollution-free, such as slurry and paint splashing, curing agent, grease and so on. For excessive float pulp, it is better to first use slight roughing, polishing, oil-stained ground, using electric angle grinder to polish.

c. The cracks and empty drum on the floor surface should be repaired first.

d. Whatever method is used to treat the surface, a clean, solid and dry base surface must be obtained. It is especially important that the grassroots should not be in a state of rising tide.

e. The base layer is cleaned and sanded with a sander.

APPLICATION 

Application conditions: Substrate temperature shall be at 3 ℃ higher than dew point, relative humidity less than 85%. Measurement of temperature and humidity should be close to substrate.

这里可以自定义设置

CLASSICAL COATING SYSTEM

Please inquiry JIANBANG Paint for specific coating solutions.

这里可以自定义设置

SAFETY AND HEALTH

Please refer to MSDS before using this product. If you do not fully understand the restrictions, or cannot follow MSDS directions strictly, do not use this product. This volatile product is flammable. Keep this product away from flame or fire. Smoking is strictly prohibited in working area. Keep working area ventilated during application to make sure solvent vapor content is low in the air. PPE is necessary to avoid this product contacting with eyes or skin. More detailed safety tips are based on practical situation.

Please handle used paint barrel correctly to avoid any pollution.

 

Storage:

Store this product in shady, dry, and ventilated warehouse. The shelf life is 12 months at room temperature. If exceeding shelf life, the products shall be tested before using.

 

Disclaimer:

All technical data given in this document is based on our knowledge achieved in lab and practice, it is not completely correct. Although we try to keep the validity of our advice, however we cannot predict the practical conditions that will affect paint quality. Herein, we cannot be responsible for the consequences of variations in such conditions, or for unforeseen conditions. We reserve the right to modify this document without informing in advance. 

Packaging

Packing size

Packing weight

Part A

30L

30 KG

Part B

10L

10 KG

Certificate

  • CE Certificate
    CE Certificate
  • Environmental Management Syatem ISO14001 New
    Environmental Management Syatem ISO14001 New
  • Occupational Health And Safety Management System OHSAS 18001 New
    Occupational Health And Safety Management System OHSAS 18001 New
  • Quality Management System ISO 9001 New
    Quality Management System ISO 9001 New
  • ROHS Report
    ROHS Report
  • SASO1
    SASO1
  • sgs1
    sgs1
  • sgs2
    sgs2
  • SRC
    SRC

PRODUCT MESSAGE

社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
We will get back to you asap