loading

YMS paint manufacturers started in 2001, specialized in the production of customized  coatings. | YMS Paint the professional Industrial Paint Suppliers, Anti Corrosive Paint Manufacturer.

这里可以自定义设置
JB Epoxy paint-101(F-2)
B站不支持收货地址
B站不支持库存规格
Resistance To Impact:
No blisters, rust, delamination, creepage
Color:
Offwhite ,yellow and black or selected by Color chart
Density:
1.5kg/l
Solid Volume:
≥85%
Theoretical Spreading Rate:
~0.93
Pot Life, Hours@23±2℃:
2H at 20 oC
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容
这里可以自定义设置
这里可以自定义设置
这里可以自定义设置

To touch/H3H

Overcoating

M:3.5H

Thickness

1mm

Color Variation

Color may vary from batch to batch. JIANBANG ensures color variation ∆E≤0.2. Suggest use the same batch to achieve best color consistency.

Packaging

Part A 15 kg in an iron barrel Part B 5 kg in an iron barrel.

Pot life

Part A 12 months, Part B 12 months

* Make sure no chalking and other contaminations before recoating.

* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition.

这里可以自定义设置

SURFACE TREATMENT

 

All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.

 

Steel: Sanding to Sa2.5 (ISO8501-1:2007). It is acceptable to polish by power tools to meet at least St2.0(ISO8501-1:2007).

Concrete surface treatment:

a. First of all, it is necessary to confirm whether reliable damp-proof facilities are installed below the concrete base. The new concrete or cement base should be cured for at least 28 days, and its moisture content should not exceed 5%. The moisture content of the base should be evaluated by empirical method.

b. The base surface should be clean, solid and pollution-free, such as slurry and paint splashing, curing agent, grease and so on. For excessive float pulp, it is better to first use slight roughing, polishing, oil-stained ground, using electric angle grinder to polish.

c. The cracks and empty drum on the floor surface should be repaired first.

d. Whatever method is used to treat the surface, a clean, solid and dry base surface must be obtained. It is especially important that the grassroots should not be in a state of rising tide.

e. The base layer is cleaned and sanded with a sander.

APPLICATION 

Application conditions: Substrate temperature shall be at 3 ℃ higher than dew point, relative humidity less than 85%. Measurement of temperature and humidity should be close to substrate.

这里可以自定义设置

CLASSICAL COATING SYSTEM

Please inquiry JIANBANG Paint for specific coating solutions.

这里可以自定义设置

Packaging

Packing size

Packing weight

Part A

20L

20 KG

Part B

6L

5 KG

  • CE Certificate
    CE Certificate
  • Environmental Management Syatem ISO14001 New
    Environmental Management Syatem ISO14001 New
  • Occupational Health And Safety Management System OHSAS 18001 New
    Occupational Health And Safety Management System OHSAS 18001 New
  • Quality Management System ISO 9001 New
    Quality Management System ISO 9001 New
  • ROHS Report
    ROHS Report
  • SASO1
    SASO1
  • sgs1
    sgs1
  • sgs2
    sgs2
  • SRC
    SRC
社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
We will get back to you asap