loading

YMS paint manufacturers started in 2001, specialized in the production of customized  coatings. | YMS Paint the professional Industrial Paint Suppliers, Anti Corrosive Paint Manufacturer.

METAL PAINT

Oriented by technology, we serve customers worldwide not only our high quality products, but also technical consultation and engineering scenarios.

Home  > PRODUCTS  > Metal Protection Paint  > 

Mastic Asphalt Paint for Pipeline and Lining with Flame Retardant Ability

这里可以自定义设置
Mastic Asphalt Paint for Pipeline and Lining with Flame Retardant Ability
B站不支持收货地址
B站不支持库存规格
Color:
Black
Usage
Glossy or no gloss
Density:
~1.35 Kg/L(after mixing)
Solid Volume:
(65±2)%
Theoretical Spreading Rate:
4.81㎡/Kg (100μm dry film thickness)
Film Thickness:
100 um dry film thickness (about 155 um wet film thickness)
Flash Point:
27℃
Shelf Life:
12 months
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容
这里可以自定义设置

PRODUCT DESCRIPTION

Mastic Asphalt has two kinds, for pipeline and lining. Mastic asphalt for lining is also known as cold asphalt mastic. It is composed of mastic mixed finish, mastic silver finish, rubber powder with good moisture-proof, waterproof, insulation and flame retardant ability. Besides, it also contains mastic, natural asphalt, appropriate additives, asbestos, phenolic resin, etc. As a new, cheap and excellent anti-corrosive, heat insulation and heat preservation material, this product is suitable for anti-corrosive protection in heat insulation project.

 

Typical Uses:

FL-1 Mastic Asphalt is mainly used for pipeline heat preservation and moisture-proof, adopting insulation wrapping as coating method; L is applicable for inlaying, scraping, concave filling, fissures mending and lining. Auxiliary network belt is required for construction. 

这里可以自定义设置
这里可以自定义设置

Application Guide

● Mixing: 

Ready to use

● Thinner:

Special thinner for mastic asphalt

● Airless spray:

Nozzle tip: 0.025~0.031 inches

Spray pressure: 18~28Mpa

Thinner ratio: 5~15%(by weight of paint)

● Brush, Roller:

Recommended

Must achieve required thickness

DRYING SCHEDULE 

Substrate temperature

10°C

20°C

30°C

To touch(50um)

6h

4h

2h

To handle(50um) 

48h

24h

16h

Min. recoating time 56h6h4h
Max. recoating time60d30d30d

* Make sure no chalking and other contaminations before recoating.

* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation conditions, humidity, mechanical strength,etc.

这里可以自定义设置

SURFACE TREATMENT

 

All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.
For bare steel, it shall be sandblasted to reach Sa2.5(iso8501-1:2007) standard. Depending on the environment of the non-immersed part, grinding with power tools is acceptable but shall at least reach St2(iso8501-1:2007) standard.
For shop primed steel, the shop primer shall be clean, dry and approved. 
For surface painted coatings, this product can apply only to clean, dry and good compatible primer.

APPLICATION 

Application conditions: Substrate temperature shall be at 3 ℃higher than dew point, relative humidity less than 85%. Measurement of temperature and humidity should be close to substrate.

这里可以自定义设置

CLASSICAL COATING SYSTEM

Please inquiry JIANBANG Paint for specific coating solutions.

Classic Coating System

Mastic Asphalt ---2*50μm(dry film thickness)

这里可以自定义设置

SAFETY AND HEALTH

Please refer to MSDS before using this product. If you do not fully understand the restrictions, or cannot follow MSDS directions strictly, do not use this product. This volatile product is flammable. Keep this product away from flame or fire. Smoking is strictly prohibited in working area. Keep working area ventilated during application to make sure solvent vapor content is low in the air. PPE is necessary to avoid this product contacting with eyes or skin. More detailed safety tips are based on practical situation. 
Please handle used paint barrel correctly to avoid any pollution.

 

Storage:

Store this product in shady, dry, and ventilated warehouse. The shelf life is 12 months at room temperature.  If exceeding shelf life, the products shall be tested before using.

 

Disclaimer:

All technical data given in this document is based on our knowledge achieved in lab and practice, it is not completely correct. Although we try to keep the validity of our advice, however we cannot predict the practical conditions that will affect paint quality. Herein, we cannot be responsible for the consequences of variations in such conditions, or for unforeseen conditions. We reserve the right to modify this document without informing in advance. 

Packing size

Packing weight

20L

22KG

Certificate

  • CE Certificate
    CE Certificate
  • Environmental Management Syatem ISO14001 New
    Environmental Management Syatem ISO14001 New
  • Occupational Health And Safety Management System OHSAS 18001 New
    Occupational Health And Safety Management System OHSAS 18001 New
  • Quality Management System ISO 9001 New
    Quality Management System ISO 9001 New
  • ROHS Report
    ROHS Report
  • SASO1
    SASO1
  • sgs1
    sgs1
  • sgs2
    sgs2
  • SRC
    SRC
社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
We will get back to you asap