loading

YMS paint manufacturers started in 2001, specialized in the production of customized  coatings. | YMS Paint the professional Industrial Paint Suppliers, Anti Corrosive Paint Manufacturer.

这里可以自定义设置
Thick film epoxy resin floor paint for all kinds of hall floors
B站不支持收货地址
B站不支持库存规格
Color:
Customized
Usage
Glossy
Density:
~1.32 Kg/L (after mixing)
Solid Volume:
(70±2 )%
Theoretical Spreading Rate:
5.3m²/Kg (100µm dry film thickness)
Film Thickness:
100µm dry film thickness (about 143µm wet film thickness)
Full Cure:
(23±2℃) 7~15 d
Flash Point:
31℃
Shelf Life:
12 months
To Touch, Minutes@23±2 °C:
4h
To Handle, Hours@23±2 °C:
24h
Pot Life, Hours@23±2℃ :
1h
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容
这里可以自定义设置

PRODUCT DESCRIPTION

This product is a high solid two-component coating composed of modified epoxy resin, tinting filler, auxiliary agent and elastic polyacyl curing agent. Besides, this paint also needs to add wear-resistant filler before using in the field construction. Meanwhile, the paint film has excellent resistance to oil, corrosion, dust and impact. Furthermore, the film has high gloss, soft color, durability, elastic, etc.

Typical Uses:

This product is designed for decorative hall floor such as all kinds of industries production workshop floor, hotel, stadium, station, etc.

这里可以自定义设置
这里可以自定义设置

Application Guide

● Mixing:

Use the power mixer to mix the main paint evenly, and then as you stir it, you add the hardener until you get to mix well. Generally, if the temperature below 10 ℃, it needs 20 min induction time; if the temperature over 10℃, it needs 15 min induction time.

● Mixing Ratio:

Part A: Part B= 20: 5 (by weight).

● Brush、Roller:

Recommended
Must achieve required thickness

DRYING SCHEDULE 

Substrate temperature

10 °C

20 °C

30 °C

To touch (100µm)

8h

4h

3h

To handle (100µm)

48h

24h

24h

Min. recoating time

8h

4h

3h

Max. recoating time

-

-

-

Pot life

1.5h

1h

0.5h

* Make sure no chalking and other contaminations before recoating.

* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition.

这里可以自定义设置

SURFACE TREATMENT

 

a. Concrete grass-roots floor, first of all, must confirm whether the base surface concrete below whether there is a reliable moisture-proof facilities. New concrete or cement base at least 28 days of maintenance time, and its water content should not exceed 5%, using empirical methods to assess the water content of the base.  
b. The grass-roots floor surface should be clean, solid and free of contaminants, such as mortar and paint sputtering, maintenance agents, grease, etc. For too much floating pulp, it is best to use light roughing, grinding. Oily ground, using electric angle grinder grinding.
c. The surface of the ground cracks, empty drums and other defects should be repaired and flat.  
d. No matter what method is used to treat the surface, it must eventually be clean, solid and dry on the grass-roots surface. It is particularly important that the grass-roots level must not be in a state of rising moisture. 
e. Grassroots clean-up, polished with a polishing machine.

APPLICATION 

Application conditions: Substrate temperature shall be at 3 ℃ higher than dew point, relative humidity less than 85%. Measurement of temperature and humidity should be close to substrate.

这里可以自定义设置

CLASSICAL COATING SYSTEM

Please inquiry JIANBANG Paint for specific coating solutions.

Epoxy Sealing Primer: 1*30 µm (dry film thickness)

Epoxy Putty: 1~2mm (dry film thickness)

Thick Film Industrial Floor Paint: 100 µm(dry film thickness)

这里可以自定义设置

SAFETY AND HEALTH

Please refer to MSDS before using this product. If you do not fully understand the restrictions, or cannot follow MSDS directions strictly, do not use this product. This volatile product is flammable. Keep this product away from flame or fire. Smoking is strictly prohibited in working area. Keep working area ventilated during application to make sure solvent vapor content is low in the air. PPE is necessary to avoid this product contacting with eyes or skin. More detailed safety tips are based on practical situation.

Please handle used paint barrel correctly to avoid any pollution.

 

Storage:

Store this product in shady, dry, and ventilated warehouse. The shelf life is 12 months at room temperature. If exceeding shelf life, the products shall be tested before using.

 

Disclaimer:

All technical data given in this document is based on our knowledge achieved in lab and practice, it is not completely correct. Although we try to keep the validity of our advice, however we cannot predict the practical conditions that will affect paint quality. Herein, we cannot be responsible for the consequences of variations in such conditions, or for unforeseen conditions. We reserve the right to modify this document without informing in advance. 

Packaging

Packing size

Packing weight

Part A

20L

20 KG

Part B

6L

5 KG

Certificate

  • CE Certificate
    CE Certificate
  • Environmental Management Syatem ISO14001 New
    Environmental Management Syatem ISO14001 New
  • Occupational Health And Safety Management System OHSAS 18001 New
    Occupational Health And Safety Management System OHSAS 18001 New
  • Quality Management System ISO 9001 New
    Quality Management System ISO 9001 New
  • ROHS Report
    ROHS Report
  • SASO1
    SASO1
  • sgs1
    sgs1
  • sgs2
    sgs2
  • SRC
    SRC

PRODUCT MESSAGE

社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
We will get back to you asap