This product is composed of high performance synthetic resin, curing agent, additive, solvent, etc. Meanwhile, the coating has low viscosity and good permeability. Besides, this coating has strong adhesion between film and coated surface, and is suitable for a certain temperature of the wet substrate surface or wet air construction.
Typical Uses:
This product can be used for waterproof sealing layer of the substrate surface such as the cement mortar, concrete and asbestos cement board.
Application Guide
● Mixing:
Use the power mixer to mix the main paint evenly, and then as you stir it, you add the hardener until you get to mix well.
● Mixing Ratio:
Part A: Part B= 18:9(by weight).
● Thinner:
Sealing primer exclusive curing agent
● Airless Spray:
Nozzle tip: 0.017~0.023 inches.
Spray pressure: 15~18 MPa.
Thinner ratio: 0~10% (by weight of paint).
● Brush, Roller:
Recommended for small areas only.
Must achieve required thickness.
Substrate temperature | 10 °C | 20 °C | 30 °C |
To touch (20μm) | 8h | 4h | 3h |
To handle (20μm) | 48h | 24h | 20h |
Min. recoating time | 8h | 4h | 3h |
Max. recoating time | - | - | - |
Pot life | 4h | 2h | 1h |
* Make sure no chalking and other contaminations before recoating. | |||
* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition. |
SURFACE TREATMENT
Surface treatment of each base course: the quality of the cement slurry and concrete base course shall conform to JGJ73-91 code for construction and acceptance of building decoration engineering. The base surface must be clean, dry, firm, free of grease and other dirt, with a PI value less than 10. If have the metope of old besmear film, answer will loose, fall off, the besmear film that powdery is cleared clean, grind with sandpaper level off. In case of mildew on the wall, wash with 25% bleach in hot water. Leave the washing solution on the surface for 10 minutes. Then rinse surface thoroughly with clean water, surface should dry for 48 hours before applying. The surface and gap should be coated with the company's construction materials special putty wipe flat. After the treatment of the wall, the wall should be dry as soon as possible after the construction, so as to avoid re-pollution.
Packaging | Packing size | Packing weight |
Part A | 20L | 18 KG |
Part B | 12L | 9 KG |
Copyright © 2020 Changzhou IMS New Materials Technology Co., Ltd. | All Rights Reserved | XML
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.