Oriented by technology, we serve customers worldwide not only our high quality products, but also technical consultation and engineering scenarios.
Mixin | Ready to use |
Airless spray | Not recommende |
Brush、Roller | Not recommende |
Scraper | Recommende |
Substrate Temperature | 10 ℃ | 20 ℃ | 30 ℃ |
To touch(1mm) | 8h | 4h | 3h |
To handle(1mm) | 36h | 24h | 20h |
Min. recoating time | 36h | 24h | 20h |
Max. recoating time | - | - | - |
* Make sure no chalking and other contaminations before recoating.
* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation conditions, humidity, mechanical strength, etc.
Color | Light yellow |
Gloss | Glossy |
Density | ~1.2Kg/L |
Solid Volume | (65±2 )% |
Standard Film thickness | 1mm dry film thickness (about 1.54mm wet film thickness) |
Theoretical spreading rate | 0.54m²/Kg (1mm dry film thickness) |
Full cure | (23±2℃ )7d |
Copyright © 2020 Changzhou IMS New Materials Technology Co., Ltd. | All Rights Reserved | XML
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.