PRODUCT DESCRIPTION
Typical Uses:
PRODUCT SELLING POINT
● Nanotechnology, compact structure.
● The coating structure is designed independently.
● Import of 80% raw materials.
● Qualified for export of hazardous chemicals.
● Performance and color optimization customization.
The quality of cement mortar and concrete base shall conform to JGJ73-9Construction acceptance code for architectural decoration engineering. With the PH value less than 10, the base surface must be clean, dry, solid and free from oil and other dirt. In case of old coating film wall, the loose, detached and powdered coating shall be removed. Besides, the surface shall be smooth by burnished. In case of wall with mildew, wash the wall with hot water containing 25% bleach, and leave the detergent on the surface for 10 minutes. Then rinse the surface thoroughly with clean water, and coat it after drying for 48 hours. In addition, use the exclusive putty for construction materials from the company to fill the gap and smooth the rough surface. Furthermore, please paint after the wall is dry as soon as possible to avoid re-contamination.
Substrate Temperature | 10 ℃ | 20 ℃ | 30 ℃ |
To touch(20um) | 4h | 2h | 1.5h |
To handle(20um) | 24h | 24h | 20h |
Min. recoating time | 24h | 24h | 20h |
Max. recoating time | - | - | - |
* Make sure no chalking and other contaminations before recoating.
* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation conditions, humidity, mechanical strength, etc.
Color | Milky white |
Gloss | Glossy |
Density | ~1.0Kg/L |
Solid Volume | (40±2 )% |
Standard Film thickness | 20um dry film thickness (about 50um wet film thickness) |
Theoretical spreading rate | 20m²/Kg (20um dry film thickness) |
Full cure | (23±2℃ )7d |
Copyright © 2020 Changzhou IMS New Materials Technology Co., Ltd. | All Rights Reserved | XML
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.