loading

YMS paint manufacturers started in 2001, specialized in the production of customized  coatings. | YMS Paint the professional Industrial Paint Suppliers, Anti Corrosive Paint Manufacturer.

METAL PAINT

Oriented by technology, we serve customers worldwide not only our high quality products, but also technical consultation and engineering scenarios.

Home  > PRODUCTS  > Metal Protection Paint  > 

High quality Alkyd Resin Mica Iron Oxide Intermediate Paint for steel and wood structure

这里可以自定义设置
High quality Alkyd Resin Mica Iron Oxide Intermediate Paint for steel and wood structure
B站不支持收货地址
B站不支持库存规格
Color:
Grey, Red brown, Grey brown
Usage
Flat, Matte
Density:
~1.55 Kg/L
Solid Volume:
(58±2 )%
Adhesion Strength:
1
Theoretical Spreading Rate:
4.67m²/Kg(80µm dry film thickness)
Film Thickness:
80µm dry film thickness (about 138µm wet film thickness)
Flash Point:
35 ℃
Shelf Life:
12 months in sealed container
To Touch, Minutes@23±2 °C:
1h
To Handle, Hours@23±2 °C:
24h
参数暂无数据
多属性暂无数据
B站不支持优惠卷

Add success, do you want to check your shopping cart?

暂无分享
B站不支持产品保障
该产品后台详情无内容
这里可以自定义设置

PRODUCT DESCRIPTION

This product is a anti-rust paint composed of oil-neutral dry vegetable oil modified alkyd resin. In addition, it contains no lead, non-toxic, good adhesion and nitro resistance.

Typical Uses:

This product can be used in light or medium corrosive environment with alkyd paint as the internal and external surface of steel and wood structure.

这里可以自定义设置
这里可以自定义设置

Application Guide

● Mixing: 

Ready to use

● Thinner:

Alkyd thinner.

● Airless Spray:

Nozzle tip: 0.017~0.023 inches.

Spray pressure: 15~18 MPa.

Thinner ratio: 5~15% (by weight of paint).

● Brush, Roller:

Recommended for small areas only.

Must achieve required thickness.

DRYING SCHEDULE 

Substrate temperature

10 °C

20 °C

30 °C

To touch (40μm)

5h

1h

30min

To handle (40μm)

48h

24h

12h

Min. recoating time

36h

24h

12h

* Make sure no chalking and other contaminations before recoating.

* Above data for reference only, actual drying time and recoating time is dependent on temperature, dry film thickness, ventilation condition.

这里可以自定义设置

SURFACE TREATMENT

 

All surface to be coated shall be clean and dry. The surface shall be evaluated and treated according to ISO8504 standard.

Steel: Sanding to Sa2.5 (ISO8501-1:2007). It is acceptable to polish by power tools to meet at least St2.0(ISO8501-1:2007).

Steel painted workshop primer: clean, dry and approved workshop primer.

Surface painted coatings:  apply only to clean, dry and good compatible primer.

这里可以自定义设置
这里可以自定义设置

Packaging

Packing size

Packing weight

 

20L

25 KG

  • CE Certificate
    CE Certificate
  • Environmental Management Syatem ISO14001 New
    Environmental Management Syatem ISO14001 New
  • Occupational Health And Safety Management System OHSAS 18001 New
    Occupational Health And Safety Management System OHSAS 18001 New
  • Quality Management System ISO 9001 New
    Quality Management System ISO 9001 New
  • ROHS Report
    ROHS Report
  • SASO1
    SASO1
  • sgs1
    sgs1
  • sgs2
    sgs2
  • SRC
    SRC
社媒暂无评论
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
We will get back to you asap